Vishnugad-Pipalkoti Hydroelectric Project
Location: Pipalkoti, India Year: 2014 Equipment Supplied: 1 No. x Ø9.86m Double Shield Hard Rock TBM 13 km Continously Advancing Tunnel Conveyor System
Location: Pipalkoti, India Year: 2014 Equipment Supplied: 1 No. x Ø9.86m Double Shield Hard Rock TBM 13 km Continously Advancing Tunnel Conveyor System
Location: Xe-Pien, Laos Year: 2014 Equipment Supplied: 1 No. x Ø5.74m Double Shield Hard Rock TBM
Location: Mae Taeng, Thailand Year: 2016 Equipment Supplied: 2 No. x Ø4.74m Double Shield Hard Rock TBM
Location: Mumbai, India Year: 2019, 2021 Equipment Supplied: 2 No. x Ø3.20m Open TBM