Vishnugad-Pipalkoti Hydroelectric Project
Location: Pipalkoti, India Year: 2014 Equipment Supplied: 1 No. x Ø9.86m Double Shield Hard Rock TBM 13 km Continously Advancing Tunnel Conveyor System
Location: Pipalkoti, India Year: 2014 Equipment Supplied: 1 No. x Ø9.86m Double Shield Hard Rock TBM 13 km Continously Advancing Tunnel Conveyor System
Location: Bangkok, Thailand Year: 2012, 2017, 2023 Equipment Supplied: 1 No. x Ø6.44m EPB TBM 1 No. x Ø6.39m EPB TBM 2 No. x Ø6.39m EPB TBM 3.2km Tunnel Conveyor…