Project Report

Vishnugad-Pipalkoti Hydroelectric Project

01 Vishnugad Pipalkoti Hydroelectric Project (1)

Vishnugad-Pipalkoti Hydroelectric Project

SHARE THIS PROJECT

Location: Pipalkoti, India
Year: 2014
Equipment Supplied:
1 No. x Ø9.86m Double Shield Hard Rock TBM
13 km Continously Advancing Tunnel Conveyor System