Vishnugad-Pipalkoti Hydroelectric Project
Location: Pipalkoti, India Year: 2014 Equipment Supplied: 1 No. x Ø9.86m Double Shield Hard Rock TBM 13 km Continously Advancing Tunnel Conveyor System
Location: Pipalkoti, India Year: 2014 Equipment Supplied: 1 No. x Ø9.86m Double Shield Hard Rock TBM 13 km Continously Advancing Tunnel Conveyor System
Location: Xe-Pien, Laos Year: 2014 Equipment Supplied: 1 No. x Ø5.74m Double Shield Hard Rock TBM
Location: Mae Taeng, Thailand Year: 2016 Equipment Supplied: 2 No. x Ø4.74m Double Shield Hard Rock TBM
Location: Mumbai, India Year: 2019, 2021 Equipment Supplied: 2 No. x Ø3.20m Open TBM
Location: Mumbai, India Year: 2016, 2023 Equipment Supplied: 5 No. x Ø6.68m Dual Mode Hard Rock TBM 2 No. x Ø6.56m Mixed/Rock EPB TBM
Location: New Delhi, India Year: 2012, 2020, 2023 Equipment Supplied: 9 No. x Ø6.61m Mixed Type EPB TBM 3 No. x Ø6.52m Soil Type EPB TBM
Location: Bangkok, Thailand Year: 2012, 2017, 2023 Equipment Supplied: 1 No. x Ø6.44m EPB TBM 1 No. x Ø6.39m EPB TBM 2 No. x Ø6.39m EPB TBM 3.2km Tunnel Conveyor…