TERRATEC EPBM breaks through in Thailand helping Samui Island keep its title as a top Asian tourist destination

Thai contractor SCG (1995) Co Ltd. uses TERRATEC S48C refurbished Earth Pressure Balance Tunnel Boring Machine (EPBM) to excavate a 1.1km tunnel for the Samui Island flood control system. TERRATEC…

Continue ReadingTERRATEC EPBM breaks through in Thailand helping Samui Island keep its title as a top Asian tourist destination