TERRATEC Rock Slurry TBM completes Mumbai’s Priority Sewer Tunnel 1
TERRATEC’s Ø3.85m Rock Slurry TBM has achieved its final breakthrough on the Mumbai Sewage Disposal Project (MSDP) Stage II, Priority Sewer Tunnel 1 (PST-1), completing the 5.85km drive. TERRATEC is…

