TERRATEC TBMs complete Bangkok Water Transmission Tunnel Drives
Two TERRATEC EPB TBMs complete over 5km of challenging urban tunnelling beneath Bangkok to advance the city’s major water transmission upgrade. TERRATEC earth pressure balance TBMs have achieved final breakthrough…

