TERRATEC TBM celebrates breakthrough on Chennai Metro
TERRATEC TBMs achieve another breakthrough on the Chennai Metro Rail Phase-II Corridor 3, a 9km twin-tube tunnel (totalling 18km) in India. In November, TERRATEC proudly celebrated a breakthrough of the…